Saturday, September 29, 2012

Week 8


Day 55 - They finished the wrap on the outside of our house.


Day 55 - Living room windows and sliding glass door in dining room.


Day 55 - They also installed our tubs. This is the master bathroom tub.


Day 55 - Other front bedroom window.


Day 55 - They installed out windows (font bedroom window)


Day 55 - The door from the garage into the kitchen.


Day 55 - This is our front door
(well technically they installed the wrong one but it
will look kind of like this but with a window in it)


Day 55 - Water heater and furnace installed.


Day 52 - House wrap and they put the shingles are
on the top of the roof waiting to be installed.

No comments:

Post a Comment