Day 55 - They finished the wrap on the outside of our house. |
Day 55 - Living room windows and sliding glass door in dining room. |
Day 55 - They also installed our tubs. This is the master bathroom tub. |
Day 55 - Other front bedroom window. |
Day 55 - They installed out windows (font bedroom window) |
Day 55 - The door from the garage into the kitchen. |
Day 55 - This is our front door (well technically they installed the wrong one but it will look kind of like this but with a window in it) |
Day 55 - Water heater and furnace installed. |
No comments:
Post a Comment